In the traditional petrochemical industry, we have strong technological and brand advantages, equipped with technology packages of our own. Technologies we have mastered enable us to have completed the EPC (Domestic) of 14 categories of large-scale petrochemical facilities, e.g. ethylene complex, polymers plant, ethylene glycol unit, fertilizer complex, acetic acid plant, methanol plant, storage facility (including offshore part), LNG terminal, natural gas processing and transmission facility, chemical mining development, large-scale styrene / polystyrene / butadiene / PVC installations, pharmaceutical plant and so on.

We completed the world's largest acrylic unit - Formosa Plastics Group Ningbo NAE project, the S/SE Asia's largest oil storage facility - Sri Lanka's Ceylon Petroleum offshore oil unloading and onshore storage tank facilities, the CSPC 800,000 T/A ethylene project (in collaboration with JGC), the CSPC 200,000 T/A LDPE, 250,000 T/A HDPE and 240,000 T/A PP projects (with TCM), and completed the PetroChina Lanzhou Ethylene Plant - the first time HQC independently completed the basic design and detailed design of a large-scale ethylene plant with purchased PDP.

Also independently completed was the Zhejiang PC 1.4 Million T/A Ethylene Plant which is the largest single train ethylene unit in China. Other large-scale ethylene facilities we accomplished include Dushanzi 1 Million T/A Ethylene Project, Sichuan 800,000 T/A Ethylene Project, Fushun 800,000 T/A Ethylene Project, Daqing 1.2 Million T/A Ethylene Project and etc. Further, HQC undertook the Shenhua Ningxia Coal Group 500,000 T/A PP Project & 1 Million T/A olefins project and Sichuan PC 450,000 T/A PP Project. The Singapore Double Train Ethylene Project made HQC a recognized top mechanical installation contractor in Singapore. Execution of the Saudi Arabia 400,000 T/A High-Density Polyethylene (HDPE) Project opens the way for HQC to operate in Saudi Arabia and the Middle East.